Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Site Establishment SWMS 10624-1

Site Establishment SWMS 10624-1

Product SKU: 10624
Site Establishment SWMS 10624-1 Video

Other Details

PDF Download:
Site Establishment SWMS 10624-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Site Establishment Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with establishing a new work site. Included in this SWMS is planning and preparation, traffic control, exclusion zones, general site hazards such as manual handling, PPE and working at heights.

Job Steps Covered in Site Establishment SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival onsite
  4. Traffic management
  5. Site setup
  6. Working at height (setting up barricades, hoarding etc.)
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...