Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Smoke Alarm Testing and Installation SWMS 10433-1

Smoke Alarm Testing and Installation SWMS 10433-1

Product SKU: 10433
Smoke Alarm Testing and Installation SWMS 10433-1 Video

Other Details

PDF Download:
Smoke Alarm InstallationTesting and Servicing 10433-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Smoke Alarm Testing and Installation Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) covers general safety hazards and risks involved with hard wired smoke alarm installation and alarm servicing. Included in this SWMS is working with electricity, slips, trips, falls and manual handling hazards associated with the task.

Job Steps Covered in Smoke Alarm Testing and Installation SWMS: 

 (includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & assess onsite conditions
  4. Work area set up
  5. Running electrical wiring /installing smoke alarms
  6. New smoke alarm commissioning
  7. Servicing/ maintenance/ testing
  8. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...