Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Softfall Surface Installation SWMS 10340-4

Softfall Surface Installation SWMS 10340-4

Product SKU: 10340
Softfall Surface Installation SWMS 10340-4 Video

Other Details

PDF Download:
Softfall_Surface_Installation_SWMS_10340-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Soft Fall Surface Installation Safe Work Method Statement Scope:

This SWMS covers general aspects associated with the preparation and laying of wet pour rubber (soft fall surfacing) on various surfaces. This includes preparing sub grade, manual handling, working adjacent to mobile plant and the safe use of associated machinery.

Job Steps Covered in Soft Fall Surface Installation SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. General Work Area Set Up
  5. Delivery of materials and mobile plant
  6. Setting out/ profiling building lines
  7. Preparing soil base
  8. Preparing an existing hard surface i.e. concrete etc
  9. Mixing wet pour rubber
  10. Application & finishing
  11. Refuelling small engine equipment on site (mixer etc)
  12. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...