Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Solar Panel Installation SWMS 10

Solar Panel Installation SWMS 10

Product SKU: 10054
Solar Panel Installation SWMS 10 Video

Other Details

PDF Download:

  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • A Falls Emergency Rescue Plan is included in this SWMS
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Solar Panel Installation Safe Work Method Statement

This SWMS covers general aspects associated with installation of solar panels on a roof. This includes working at height, harness use, power tools, electrical installation, panel installation and installation of a battery bank.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Solar Panel Installation SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Involves a risk of a person falling more than 2m, including work on telecommunications towers
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Unloading / storage of materials
    • Work area set up
    • Install Inverter / Isolator
    • Lifting panels / material on roof
    • Install mounting rails and panels
    • Wiring panels
    • Lead acid battery banks
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 


app-store-badge.png       google-play-badge.png


For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!



View Cart

You May Also Need...