Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Solar Panel Installation SWMS 10054-5

Solar Panel Installation SWMS 10054-5

Product SKU: 10054
Solar Panel Installation SWMS 10054-5 Video

Other Details

PDF Download:
solar_panel_installation_swms_10054-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Solar Panel Installation Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with installation of solar panels on a roof. This includes working at height, harness use, power tools, electrical installation, panel installation and installation of a battery bank.

Job Steps Covered in Solar Panel Installation SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess ons-site conditions
  4. Unloading / storage of materials
  5. Work area set up
  6. Install Inverter / Isolator
  7. Lifting panels / material onto roof
  8. Install mounting rails and panels
  9. Wiring panels
  10. Lead acid battery banks
  11. On Completion
  12. Record Keeping/Health Monitoring

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...