Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Sport - Playground Equipment Installation SWMS 10467-1

Sport - Playground Equipment Installation SWMS 10467-1

Product SKU: 10467
Sport - Playground Equipment Installation SWMS 10467-1 Video

Other Details

PDF Download:
Sport - Playground Equipment Installation SWMS 10467-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Sport - Playground Equipment Installation Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the installation of sporting and playground equipment such as basketball hoops and pole, football goal posts, playground equipment or any other apparatus that requires excavation and assembly of the equipment in a public area. This SWMS covers excavation, working around machinery, public safety and hazardous manual handling. 

Job Steps Covered in Sport - Playground Equipment Installation SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at Site
  4. Work Area Set Up
  5. Materials Delivery
  6. Excavating Footings
  7. Setting Equipment, Frames etc. into Footings
  8. Equipment Assembly
  9. On Completion

Click here to view a sample of the Sport - Playground Equipment Installation SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...