Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Structural Steel Construction SWMS 10372-3

Structural Steel Construction SWMS 10372-3

Product SKU: 10372
Structural Steel Construction SWMS 10372-3 Video

Other Details

PDF Download:
structural_steel_construction_swms_10372-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Structural Steel Construction Safe Work Method Statement Scope:

This SWMS covers general safety controls in the erection of multi-element structural steel structures such as columns, beams, bracing, rafters, flooring material, steel decking and other related steel work using a crane. Included in this SWMS is planning and preparation, training and competency requirements, working at heights, rigging and falling objects management.

Job Steps Covered in Structural Steel Construction SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival Onsite
  4. Materials Delivery
  5. Work Area Setup
  6. Erecting Steel Components
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...