Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Surveyor Inspection SWMS 10623-1

Surveyor Inspection SWMS 10623-1

Product SKU: 10623
Surveyor Inspection SWMS 10623-1 Video

Other Details

PDF Download:
Surveyor SWMS 10623-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Surveyor Inspection Safe Work Method Statement Scope:

This SWMS covers hazards associated with the process of inspecting and surveying. Included in this SWMS is planning and preparation, training, working near traffic, powered mobile plant movement, near water, working in public and remote areas and, the use of Lasers. 

Job Steps Covered in Surveyor Inspection SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival onsite
  4. Inspecting/ working in public areas
  5. Inspecting/ working in remote areas
  6. Powered mobile plant movement at waste stations, construction sites etc.
  7. Working adjacent to roads
  8. Work carried out near water – coastal pools, rock walls, retaining walls etc.
  9. Operating lasers
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...