Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Surveyor SWMS 10623-1

Surveyor SWMS 10623-1

Product SKU: 10623
Surveyor SWMS 10623-1 Video

Other Details

PDF Download:
Surveyor SWMS 10623-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • You must have Microsoft Word or iAuditor to use this template

Surveyor Safe Work Method Statement

This SWMS covers hazards associated with the process of inspecting and surveying. Included in this SWMS is planning and preparation, training, working near traffic, powered mobile plant movement, near water, working in public and remote areas and, the use of Lasers. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Surveyor SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
    • In or near water or other liquid that involves risk of drowning
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Arrival onsite
    • Inspecting/ working in public areas
    • Inspecting/ working in remote areas
    • Powered mobile plant movement at waste stations, construction sites etc.
    • Working adjacent to roads
    • Work carried out near water – coastal pools, rock walls, retaining walls etc.
    • Operating lasers
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...