Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Swimming Pool Construction SWMS 10371-4

Swimming Pool Construction SWMS 10371-4

Product SKU: 10371
Swimming Pool Construction SWMS 10371-4 Video

Other Details

PDF Download:
Swimming Pool Construction SWMS 10371-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Swimming Pool Construction Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) provides guidance on the construction of in-ground concrete pool shells. This includes steel fixing, installing ancillary plumbing, placing formwork and the placement of concrete including shaping of the concrete shell. 

Job Steps Covered in Swimming Pool Construction SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at site
  4. Set up work area 
  5. Delivery of materials (Steel reinforcement etc.)
  6. Setting out/profiling pool
  7. Excavating foundations
  8. Installing plumbing
  9. Setting steel reinforcement
  10. Setting formwork
  11. Pouring concrete
  12. On Completion
  13. Record Keeping/ Health Monitoring

Click here to view a sample of the Swimming Pool Construction SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...