Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Tactile Paving SWMS 10497-4

Tactile Paving SWMS 10497-4

Product SKU: 10497
Tactile Paving SWMS 10497-4 Video

Other Details

PDF Download:
Tactile Paving SWMS 10497-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
 
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Tactile Paving Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with applying tactile paving to un/controlled crossings, pedestrian islands/pathways, vehicle crossovers, railway platforms, car parks etc. The methods covered in this SWMS are; liquid domes, surface applied and retrofit inlay pavers. 

Job Steps Covered in Tactile Paving SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Transporting chemicals (sealants etc) and equipment
  4. Assess onsite conditions
  5. Work area set up
  6. Surface preparation (including grinding, cutting, taping) & paver application
  7. Refuelling small engines on site
  8. On Completion

Click here to view a sample of the Tactile Paving SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...