Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Test and Tag (Class 1 & 2) SWMS 10390-4

Test and Tag (Class 1 & 2) SWMS 10390-4

Product SKU: 10390
Test and Tag (Class 1 & 2) SWMS 10390-4 Video

Other Details

PDF Download:
Test_and_Tag_Class_1 and 2_SWMS_10390-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Test and Tag - Class 1 & 2 Safe Work Method Statement Scope:

This SWMS covers the safety inspection and testing of Class (1 and 2) electrical equipment in the workplace, using a Portable Appliance Tester (PAT), with electronic push-button/function key testing functionality.  Includes equipment (including in-service equipment) connected to a General Power Outlet (GPO) by either a permanently connected flexible power supply or a detachable flexible power supply cord.

Job Steps Covered in Test and Tag - Class 1 & 2 SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess Onsite Conditions
  4. Work Area Set Up
  5. Pre Operational Inspection
  6. Operation - Initial Tests
  7. Flexible Cords
  8. Operation - Earthing & Insulation Testing
  9. Operation - Leakage Testing
  10. Tagging
  11. New Electrical Equipment
  12. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...