Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Test and Tag (Cords) SWMS 10389-4

Test and Tag (Cords) SWMS 10389-4

Product SKU: 10389
Test and Tag (Cords) SWMS 10389-4 Video

Other Details

PDF Download:
Test_and_Tag_Cords_SWMS_10389-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Test & Tag - Cords Safe Work Method Statement Scope:

This SWMS covers safety inspection and testing of electrical cords in the workplace using a Portable Appliance Tester (PAT) with electronic push-button/function key testing functionality.  This includes:

  • Cord Set – an assembly including a plug to connect to general power outlet (GPO), a sheathed flexible cord and an appliance socket
  • Cord Extension Set – an assembly including a plug to connect to a general power outlet (GPO), a sheathed flexible cord and a cord extension socket
  • Electric Portable Outlet Device (EPOD) – examples include power boards with multiple sockets, cable reels etc.

Job Steps Covered in Test & Tag - Cords SWMS: 

 (includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess Onsite Conditions
  4. Work Area Set Up
  5. Pre Operational Inspection
  6. Operation - Initial Tests
  7. Flexible Cords
  8. Tagging 
  9. New Electrical Equipment
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...