Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Test and Tag (RCD) SWMS 10391-4

Test and Tag (RCD) SWMS 10391-4

Product SKU: 10391
Test and Tag (RCD) SWMS 10391-4 Video

Other Details

PDF Download:
Test_and_Tag_RCD_SWMS_10391-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Test and Tag - Residential Current Devices (RCD) Safe Work Method Statement Scope:

This SWMS covers safety inspection and testing of Fixed Residual Current Devices (RCDs) and Portable Residual Current Devices (PRCDs) in the workplace using a portable appliance tester with electronic push-button/function key testing functionality.  Including:

  • Type I not exceeding 10 mA
  • Type II 10mA to 30mA
  • Class L single phase primarily intended for household and similar general use
  • Glass H primarily intended for general industrial use
  • Class PSOA class H assembly with two or more socket outlets minimum rating IP 33

Job Steps Covered in Test and Tag - Residential Current Devices (RCD) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess Onsite Conditions
  4. Work Area Set Up 
  5. Pre Operational Inspection
  6. Operation - Initial Tests
  7. Flexible Cords
  8. Connecting PAT to a Fixed RCD
  9. Testing Three-Phase RCDs
  10. Testing Single Phase RCDs / Each Phase of Three-phase RCDs
  11. Tagging
  12. New Electrical Equipment
  13. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...