Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Man testing and tagging a cable.

Test - Tag Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Test - Tag Safe Work Method Statement

This Test - Tag Safe Work Method Statement (SWMS) covers the safety inspection and testing of Class (1 & 2) electrical equipment in the workplace, using a Portable Appliance Tester (PAT), with electronic push-button/function key testing functionality. 

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Test - Tag SWMS:

(includes potential hazards & control measures)

  1. Training
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. New Electrical Equipment
  5. House Keeping
  6. Manual Tasks
  7. Working with Testing Equipment
  8. Conduct a Risk Assessment
  9. Pre-operational Inspection
  10. Initial Testing
  11. Flexible Cords
  12. Electric Portable Outlet Device (EPOD)
  13. Earthing & Insulation Testing
  14. Leakage Testing
  15. Test & Tag Class 1-2
  16. Connecting the Portable Appliance Tester to a Fixed RCD
  17. Three-phase RCD Testing
  18. Single-phase RCD (each phase of three-phase RCD testing)
  19. Tagging
  20. Record Keeping
  21. On Completion
  22. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Test - Tag Safe Work Method Statement

This Test - Tag Safe Work Method Statement (SWMS) covers the safety inspection and testing of Class (1 & 2) electrical equipment in the workplace, using a Portable Appliance Tester (PAT), with electronic push-button/function key testing functionality. 

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Test - Tag SWMS:

(includes potential hazards & control measures)

  1. Training
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. New Electrical Equipment
  5. House Keeping
  6. Manual Tasks
  7. Working with Testing Equipment
  8. Conduct a Risk Assessment
  9. Pre-operational Inspection
  10. Initial Testing
  11. Flexible Cords
  12. Electric Portable Outlet Device (EPOD)
  13. Earthing & Insulation Testing
  14. Leakage Testing
  15. Test & Tag Class 1-2
  16. Connecting the Portable Appliance Tester to a Fixed RCD
  17. Three-phase RCD Testing
  18. Single-phase RCD (each phase of three-phase RCD testing)
  19. Tagging
  20. Record Keeping
  21. On Completion
  22. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View