Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Test & Tag - Cords SWMS 10

Test & Tag - Cords SWMS 10

Product SKU: 10389
Test & Tag - Cords SWMS 10 Video

Other Details

PDF Download:

  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Test & Tag - Cords Safe Work Method Statement

This SWMS covers safety inspection and testing of electrical cords in the workplace using a Portable Appliance Tester (PAT) with electronic push-button/function key testing functionality.  This includes:

  • Cord Set – an assembly including a plug to connect to general power outlet (GPO), a sheathed flexible cord and an appliance socket
  • Cord Extension Set – an assembly including a plug to connect to a general power outlet (GPO), a sheathed flexible cord and a cord extension socket
  • Electric Portable Outlet Device (EPOD) – examples include power boards with multiple sockets, cable reels etc.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Test & Tag - Cords SWMS Content: 

  • High Risk Construction Work
    • Pressure gas distribution mains or piping chemical, fuel or refrigerant lines energised installations or services
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Work area set up
    • Pre operational inspection
    • Operation - Initial tests
    • Flexible cords
    • Tagging 
    • New electrical equipment
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 


app-store-badge.png       google-play-badge.png


For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!



View Cart

You May Also Need...