Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Testing and Tagging - Residential Current Devices (RCD)'s SWMS 10

Testing and Tagging - Residential Current Devices (RCD)'s SWMS 10

Product SKU: 10391
Testing and Tagging - Residential Current Devices (RCD)'s SWMS 10 Video

Other Details

PDF Download:
Test_and_Tag_RCD_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Test and Tag - Residential Current Devices (RCD) Safe Work Method Statement

This SWMS covers safety inspection and testing of Fixed Residual Current Devices (RCDs) and Portable Residual Current Devices (PRCDs) in the workplace using a portable appliance tester with electronic push-button/function key testing functionality.  Including:

  • Type I not exceeding 10 mA
  • Type II 10mA to 30mA
  • Class L single phase primarily intended for household and similar general use
  • Glass H primarily intended for general industrial use
  • Class PSOA class H assembly with two or more socket outlets minimum rating IP 33

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Power Tools SWMS Content: 

  • High Risk Construction Work
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Work area set up 
    • Pre operational inspection
    • Operation - initial tests
    • flexible cords
    • Connecting PAT to a Fixed RCD
    • Testing Three-Phase RCDs
    • Testing Single Phase RCDs / Each Phase of Three-phase RCDs
    • Tagging
    • New electrical equipment
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...