Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Traffic Control Worker SWMS 10488-3

Traffic Control Worker SWMS 10488-3

Product SKU: 10488
Traffic Control Worker SWMS 10488-3 Video

Other Details

PDF Download:
Traffic Control Worker SWMS 10488-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
 
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Traffic Control Worker Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) provides risk control measures to be undertaken for traffic control workers while work is conducted on, or near, a road and/or construction worksite.

Job Steps Covered in Traffic Control Worker SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & assessment of on-site conditions
  4. Establish safe work zone (site set-up)
  5. Equipment and site pre-start check
  6. Pedestrian /traffic management
  7. End of shift

Click here to view a sample of the Traffic Control Worker SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...