Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Traffic Corridor – establish safe work zone SWMS 10

Traffic Corridor – establish safe work zone SWMS 10

Product SKU: 10280
Traffic Corridor – establish safe work zone SWMS 10 Video

Other Details

PDF Download:
TrafficCorridor_Establish_SafeWorkZone_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • This SWMS includes a Traffic Management Plan Checklist
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Traffic Corridor – establish safe work zone Safe Work Method Statement

This pre-filled Safe Work Method Statement (SWMS) includes information to assist in the identification of effective Traffic Management Risk Controls with the view of ensuring that all reasonably practicable steps have been taken to prevent the likelihood of any traffic related incidents while work is conducted on or near a road. This document is intended for use as an attachment, to be used in addition to the relevant SWMS for the specific work being conducted in a traffic corridor.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Traffic Corridor – establish safe work zone SWMS Content: 

  • High Risk Construction Work
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor   
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Conduct Risk Assessment
    • Develop site-specific traffic management plan
    • Arrival & assessment of on-site conditions
    • Establish safe work zone (site set-up)
    • Working roadside
    • End of shift
  • Traffic Management Plan Checklist
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


  1. Handy document

    Posted by on

    We have just decided to update all of our SWMS's & make them electronic. As we currently use iAuditor for field inspection, it made sense to use this format for our SWMS's. We are a small council with only approximately 60 FTE's, so we needed a product that was out of the box but could be modified to suit our needs. This product was the first of 70, I reviewed & it covers everything we need & more importantly can be modified in the field. Great Product!


$79.95

PLUS GST

View Cart


You May Also Need...