Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Traffic Corridor (Establish Safe Work Zone) SWMS 10280-5

Traffic Corridor (Establish Safe Work Zone) SWMS 10280-5

Product SKU: 10280
Traffic Corridor (Establish Safe Work Zone) SWMS 10280-5 Video

Other Details

PDF Download:
traffic_corridor_establish_safe_work_zone_swms_10280-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Traffic Corridor (Establish Safe Work Zone) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) includes information to assist in the identification of effective Traffic Management Risk Controls with the view of ensuring that all reasonably practicable steps have been taken to prevent the likelihood of any traffic related incidents while work is conducted on or near a road. A Traffic Management Plan Checklist is included in this SWMS.

This document is intended for use as an attachment, to be used in addition to the relevant SWMS for the specific work being conducted in a traffic corridor.

Job Steps Covered in Traffic Corridor (Establish Safe Work Zone) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Conduct Risk Assessment
  4. Develop site-specific traffic management plan
  5. Arrival & assessment of on-site conditions
  6. Establish safe work zone (site set-up)
  7. Working roadside
  8. End of shift


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


  1. Handy document

    Posted by on

    We have just decided to update all of our SWMS's & make them electronic. As we currently use iAuditor for field inspection, it made sense to use this format for our SWMS's. We are a small council with only approximately 60 FTE's, so we needed a product that was out of the box but could be modified to suit our needs. This product was the first of 70, I reviewed & it covers everything we need & more importantly can be modified in the field. Great Product!


$79.95

PLUS GST

View Cart


You May Also Need...