Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Traffic Line Removal (using Skid Steer Loader) SWMS 10456-1

Traffic Line Removal (using Skid Steer Loader) SWMS 10456-1

Product SKU: 10456
Traffic Line Removal (using Skid Steer Loader) SWMS 10456-1 Video

Other Details

PDF Download:
Traffic Line Removal (using Skid Steer Loader) SWMS 10456-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • You must have Microsoft Word or iAuditor to use this template

Traffic Line Removal (using Skid Steer Loader) 

This SWMS covers general hazards associated with the removal of traffic line markings using a skid steer loader.  Included in this SWMS is planning and preparation, loading and unloading skid steer attachments, prestart checks, changing attachments, operational use and maintenance.

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Traffic Line Removal (using Skid Steer Loader) SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Arrival on site
    • Delivery and removal of powered mobile plant
    • Establish traffic management 
    • Pre-start check
    • Changing attacments
    • Grinding the lines
    • Maintenance on site
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 
  • Mobile Plant Pre-start Checklist

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...