Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Tree Felling (Manual) SWMS 10278-5

Tree Felling (Manual) SWMS 10278-5

Product SKU: 10278
Tree Felling (Manual) SWMS 10278-5 Video

Other Details

PDF Download:
tree_felling_manual_swms_10278-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Tree Felling - Manual Safe Work Method Statement Scope:

This SWMS involves general hazards/risks associated with the manual felling of trees.  This includes planning and preparation, environmental controls, working adjacent to mobile plant, training and communications and operational controls for hazards associated with falling trees and branches, contact with electricity and use of a chainsaw.

Job Steps Covered in Tree Felling - Manual SWMS:

 (includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Work area set up
  5. Tree Felling
  6. Cross Cutting
  7. Loading / moving felled trees
  8. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...