Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604
20% OFF ALL SWMS & SOPS!!!! Ends 5pm 31st July 2017. Enter coupon SAVE20% at checkout.

Turf Laying - Maxi Rolls SWMS 10

Product SKU: 10554
Turf Laying - Maxi Rolls SWMS 10 Video

Other Details

PDF Download:
TurfLaying_MaxiRolls_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word to use this template (SWMS Template for use with iAuditor coming soon)

Turf Laying - Maxi Roll Safe Work Method Statement

This SWMS covers general hazards associated with laying maxi turf rolls the operation of a stand-on turf-laying machine. This SWMS includes safe loading and cutting of the turf roll.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Turf Laying - Maxi Roll SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Transport, delivery and removal of mobile plant
    • Assess onsite conditions
    • Delivery of materials and mobile plant
    • Turf machine pre start check
    • Laying the turf
    • Trimming the turf
    • Rolling the turf
    • Refuelling on site
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...