Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Turf Laying (Maxi Rolls) SWMS 10554-2

Turf Laying (Maxi Rolls) SWMS 10554-2

Product SKU: 10554
Turf Laying (Maxi Rolls) SWMS 10554-2 Video

Other Details

PDF Download:
Turf Laying (maxi rolls) SWMS 10554-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Turf Laying - Maxi Roll Safe Work Method Statement Scope:

This SWMS covers general hazards associated with laying maxi turf rolls the operation of a stand-on turf-laying machine. This SWMS includes safe loading and cutting of the turf roll.
Turf Layer Pre-Start Checklist included in this SWMS.

Job Steps Covered in Turf Laying - Maxi Roll SWMS:

(includes potential hazards and control measures) 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Transport, delivery and removal of mobile plant
  4. Assess onsite conditions
  5. Delivery of materials and mobile plant
  6. Turf machine pre start check
  7. Laying the turf
  8. Trimming the turf
  9. Rolling the turf
  10. Refuelling on site
  11. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...