Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Turf Laying (Residential) SWMS 10154-4

Turf Laying (Residential) SWMS 10154-4

Product SKU: 10154
Turf Laying (Residential) SWMS 10154-4 Video

Other Details

PDF Download:
Turf Laying (residential) SWMS 10154-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Turf Laying - Residential Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the preparation and laying of turf. This includes preparing sub grade, manual handling, working adjacent to mobile plant. 

Job Steps Covered in Turf Laying - Residential SWMS:

(includes potential hazards and control measures) 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Work area setup
  5. Delivery of materials and mobile plant
  6. Setting out/ profiling
  7. Levelling, spreading top soils / sand / fertilisers
  8. Laying turf 
  9. Refuelling small engine equipment on site (vibrator plates etc.)
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...