Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Tyre Changing (Heavy Vehicle) SWMS 10414-3

Tyre Changing (Heavy Vehicle) SWMS 10414-3

Product SKU: 10414
Tyre Changing (Heavy Vehicle) SWMS 10414-3 Video

Other Details

PDF Download:
tyre_changing_heavy_vehicle_swms_10414-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Tyre Changing (Heavy Vehicle) Safe Work Method Statement Scope:

The Heavy Vehicles – Tyres, Wheels and Rims Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps for replacing heavy vehicles’ (including mobile plant) wheels, tyres and rims.

Job Steps Covered in Tyre Changing (Heavy Vehicle) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel to/between sites
  4. Changing tyres, rims & wheels - roadside
  5. Remove/ replace outer/inner wheel/s/tyres – on construction sites or workshop
  6. On completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...