Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Vegetation Control (Prescribed Burns) SWMS 10155-6

Vegetation Control (Prescribed Burns) SWMS 10155-6

Product SKU: 10155
Vegetation Control (Prescribed Burns) SWMS 10155-6 Video

Other Details

PDF Download:
Vegetation Control (prescribed burns) SWMS 10155-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Vegetation Control - Prescribed Burns Safe Work Method Statement Scope:

This SWMS includes / covers general prescribed burning operations for vegetation. This includes vehicle preparation, water points, and manual handling and general hazardous conditions found on a fire line.

This SWMS does not cover wildfire operations.

Job Steps Covered in Vegetation Control - Prescribed Burns SWMS:

(includes potential hazards and control measures) 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel to, from & between burn sites
  4. Assess onsite conditions
  5. Roadside work
  6. Obtaining Water from Hydrant or other water source e.g. creek/dam
  7. Water pump
  8. Drip torch use
  9. Conduct Burn Operations
  10. Chainsaw operations
  11. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...