Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Abrasive Blasting - Dry Air Powered SWMS

Abrasive Blasting - Dry Air Powered SWMS

Product SKU: 10230
Abrasive Blasting - Dry Air Powered SWMS Video

Other Details

PDF Download:
Abrasive_Blasting_-_Dry_Air_Powered_SWMS.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word to use this template

The Abrasive Blasting - Dry Air Powered Safe Work Method Statement (SWMS) is a comprehensive  document outlining the safety steps, main hazards, risks and controls for using Dry Air Powered Abrasive Blasting (Sandblasting) equipment. This SWMS outlines prohibited blasting media which includes silica sand, river, beach or other white sands (containing more than 1-2% crystalline silica).

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Abrasive Blasting SWMS content: 

  • High Risk Construction Work
    • Involves a risk of a person falling more than 2 metres
    • Involves structural alterations or repairs that require temporary support to prevent collapse
    • Is carried out in or near a confined space
    • Is carried out in an area that may have a contaminated or flammable atmosphere
    • Is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians
    • Is carried out in an area at a workplace in which there is any movement of powered mobile plant.
  • PPE
  • Job Steps:
    • Planning
    • Preparation
    • Pre-Operational Inspection
    • Operation
    • Maintenance
  • Emergency Procedures
  • Legislative References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix 

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...