Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Appliance Repairs SWMS

Appliance Repairs SWMS

Product SKU: 10318
Appliance Repairs SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

The Catering Equipment Repairs - Commercial Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for the repair of commercial catering equipment.

The Catering Equipment - Repairs Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This SWMS covers general hazards associated with repair, service and maintenance of commercial grade catering equipment (such as ovens/dishwashers etc) at the catering premises on ground level. Electrical works must not be conducted on live electrical installations unless deemed necessary. Ensure all persons have appropriate licenses for prescribed works (gas or electric) as relevant

Main hazards:

  -  Electric shock

  -  Exposure to hazardous atmosphere (gas)

  -  Musculoskeletal Disorder (MSD) from hazardous manual tasks

  -  Slips, trips

 A dedicated SWMS must be developed for hazards not covered in this SWMS involving high-risk work (such as asbestos removal, work at heights, or works on live electrical installations).

The Catering Equipment - Repairs Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.


The Catering Equipment - Repairs SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • LOTO – Lock Out Tag Out
  • Working around electricity
  • Ladders

Operation: (extract only)


Wear PPE and food handling/hygiene nets/booties etc as required.

Install barriers and caution signs in work area.

Liaise with relevant catering staff about the task and duration of time required to complete works – including any power isolations required that may affect other equipment)

Allow equipment to shut down / cool before commencing work.

Shut down plant as per manufacturer’s instructions. 

  • Electric
  • Hydraulics
  • Pneumatics
  • Petrol/fuel
  • Oil
  • Steam
  • LPG / Natural gas supply
  • Coal etc

Identify any sources likely to be reactive (check diagram / written instructions). Examples:

  • Pressure release (fluid, steam etc)
  • Gravity enabling equipment to fall back down
  • Stored energy
  • Associated / joined equipment / pipelines etc

Note: If plant is used for controlling other hazards (such as extractor fans) cease work that gives rise to hazards, and /or provide other means of control as needed. 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...