Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Cement Mixer - Petrol SWMS

Cement Mixer - Petrol SWMS

Product SKU: 10385
Cement Mixer - Petrol SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download Delivery
  • Provides a framework for training workers
  • Addresses generic risks and hazards
  • MS Word format allows you to make changes to the document
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks
  • Assists with compliance requirements for WHS inspections

The Petrol Cement Mixer Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps for the use of a petrol-driven cement mixer.

This SWMS covers the use of a petrol-driven portable cement mixer to mechanically mix together cement and cement products into mortar ready for use.

This SWMS does not cover the use of an electrically powered portable cement mixer.

If using an electrically powered cement mixer, the following SWMS will be required:

    - Cement Mixer – Electric

 Read the Safety Data Sheets (SDS) for all cement products and fuel before use, follow the SDS recommendations and relevant SWMS.

 Environmental risks may include damage to waterways and water catchment areas due to incorrect disposal of waste materials or from run-off of hazardous chemicals during clean up. Unleaded Petrol is toxic to aquatic organisms, may cause long-term adverse effects in the aquatic environment.

This SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Start Daily Checks
  • Fuelling
  • Operation
  • General Maintenance
  • Emergency Procedures
  • Review
  • References

This SWMS is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

Product Details:

  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Review Date: 14 March 2014

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • Fuel storage, handling and decanting
  • Concrete Preparation & Laying
  • Concrete Formwork

Product extract:

Mixing:

-       All products will be heavy to lift – use caution

-       Ensure sand / cement / aggregate or pre-mixed dry cement is positioned as close as possible to the mixer

-       If using pre-mixed dry cement, use small size bags when possible to reduce lifting heavy

-       Use smaller size flat shovel when dry mixing to reduce the weight of materials on the shovel

-       Don’t lift and twist when handling heavy materials – lift and turn

-       Wet down materials as soon as possible to reduce dust

Operating:

-       Start the drum rotating.

-       Ensure that you have a firm footing while loading the drum.

-       Do not overreach.

-       Load the drum with a shovel ensuring that the shovel does not enter the drum.

-       Empty the contents out while the drum is still rotating.

On completion ensure:

-       Mixer is switched off

-       Drum and mixer are washed clean

-       Remove waste materials from site

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...