Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Concrete - Agitator - Trailer Mounted SWMS

Concrete - Agitator - Trailer Mounted SWMS

Product SKU: 10350
Concrete - Agitator - Trailer Mounted SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

The Concrete – Agitator - Mounted Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for the use of a trailer mounted concrete agitator.

The Concrete – Agitator - Mounted Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This Safe Work Method Statement (SWMS) provides guidance on the operation of a trailer mounted concrete agitator. This includes loading raw materials, transport to site, concrete delivery and refuelling procedures.

This SWMS does not cover the operation of powered mobile plant or confined space entry for maintaining/cleaning bowl (chipping). Additional SWMS are required for these items.

Work involving a risk of a person falling more than two metres, carrying out work in or near a confined space or working around powered mobile plant is defined as “High Risk Construction Work" by Work Health and Safety Regulations 2011:

Main hazards include:

  • Contact with fluid under pressure
  • Entanglement
  • Exposure to crystalline silica from concrete dust
  • Skin irritation/damage from exposure to wet cement
  • Hit by moving vehicles

The Concrete – Agitator - Mounted Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.

The Concrete – Agitator - Mounted SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Refuelling
  • Maintenance
  • Emergency Procedures
  • Review
  • References

Related items:

Operation: (extract only)

Discharging concrete

  • Check slump and ensure correct consistency
  • Ensure delivery site barricaded if necessary to prevent entry from pedestrians and other mobile plant/trucks
  • Do not position delivery chutes above workers. Provide exclusion zone/barricades to ensure a clear pathway for delivery of concrete
  • Unsure keep fingers clear when placing chutes
  • Ensure no site personnel climb onto agitator, ladders or any part of truck during operation
  • Persons must not enter hopper at anytime

After discharge. Ensure:

  • Facilities onsite to prevent contaminated water from entering sensitive areas – must comply with Environmental requirements
  • Use defined wash area only
  • Clean vehicle using high-pressure cleaner. Do not enter Hopper/Drum.
  • Ensure vehicle clean from concrete – including tyres, before exiting site.
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...