Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Dozer - Tree Felling SWMS

Dozer - Tree Felling SWMS

Product SKU: 10279
Dozer - Tree Felling SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 18 September 2014

The Tree Felling using a Dozer Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure.  This SWMS covers hazards associated with the use of Dozers to conduct tree felling/clearing activities.

The Tree Felling using a Dozer procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Tree Felling using a Dozer Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

Related items:


Product Extract - Planning:

Ensure equipment suitable for task – (know the capabilities and limitations of particular model,

example: SWL, hp, and gradient of acceptable slopes).

Inspect intended work area. Ensure:

-       Ground surface is suitable

-       No steep slopes, unprotected drop offs, pits or trenches

-       Contact will not be made with underground utilities (dial before you dig)

-       Work is not conducted in close proximity to electrical power lines

-       Sufficient room to operate equipment

-        Remove any debris or equipment (shovels, wheelbarrows etc)

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...