Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Impact Crusher Operation SWMS

Impact Crusher Operation SWMS

Product SKU: 10349
Impact Crusher Operation SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

Crusher - Impact Information:

The Crusher - Impact Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for the use of Impact Crushers.

The Crusher - Impact Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This SWMS covers the use of Impact Crushers (mobile, large capacity) being loaded by use of an excavator.

Main hazards:

  • Falls
  • Exposure to hazardous atmosphere
  • Noise
  • Crushing
  • Hit by moving vehicle
  • Hit by ejected materials

 The Crusher - Impact Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.

The Crusher - Impact includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Transport
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References

Product Details:

  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section

Operation: (extract only) 

  • Ensure excavator operator is beside or behind crusher, with clear view of surrounding area and top of feeder.
  • Ensure bucket is correct size for feed rate/capacity of crusher.
  • Inspect bucket prior to operation to ensure good condition. Prevent components / teeth etc, falling into crusher.
  • Provide excavator pads where required and ensure these are stable with sufficient height.
  • Ensure safe access/egress for excavator operator.
  • Operate as per manufacturer's instructions, including feed rate and crusher settings.
  • Use level indicators for feed control where possible.
  • Ensure only acceptable materials loaded into crusher. Do not load:
    • Non-rock/concrete materials (clay, wood, etc)
    • Waste (such as empty gas cylinders, steel, etc)
    • Steel reinforcing larger than specified by manufacturer
    • Materials larger than acceptable dimensions specified by manufacturer
  • Consider use of feed hoppers for discharge materials. Ensure regular housekeeping/ removal of slips, trips hazards by clearing away spills from feed hopper. Do not overfill.
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...