Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Patient - Lifting Equipment - Beds - Maintenance SWMS

Patient - Lifting Equipment - Beds - Maintenance SWMS

Product SKU: 10368
Patient - Lifting Equipment - Beds - Maintenance SWMS Video

Other Details

PDF Download:
PatientLiftingEquipment_Beds_Maintenance_SWMS.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

The Preventative Maintenance SWMS for Bed in Hospitals & Aged Care facilities (SWMS) is a comprehensive procedure outlining the safety steps for the preventative maintenance of patient beds and patient lifters.

The SWMS is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This SWMS involves preventative maintenance undertaken on electric beds (12Volt), manual wind-up beds and battery-operated patient lifters in healthcare facilities such as Residential Aged Care Facilities. This may involve working on beds that have patients in the bed. This does not include patient handling activities.

This task may involve hazardous manual tasks that could lead to musculoskeletal disorders (MSD) and hazards associated with working near patients (aggression, violence, contact with biological substances).

This SWMS does not contain any High Risk Construction tasks as defined by WHS Regulations, 2011, however, dedicated site/task-specific SWMS should be developed for hazards not covered in this SWMS.

The Beds – Patient – Maintenance - Preventative Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks 

Operation: (extract only)

Bed Maintenance:

Inform relevant site personnel if changes to bed assembly are required (such as removal of side guards). Ensure arrangements are in place to protect patients from falls etc during works.

Do not use excessive force at any time. If patient remains in the bed during maintenance, arrange for assistance from relevant persons for patient handling.

Follow any instruction provided by medical staff during the maintenance works.

Upon completion, ensure bed is re-assembled in a safe manner. Test that all parts are functional.

Clear work area of any debris, packing etc. and dispose of according to site instructions.

Inspect all tools for damage etc. Ensure all tools, equipment and chemicals are removed from site. 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...