Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Portable Toilet SWMS

Portable Toilet SWMS

Product SKU: 10346
Portable Toilet SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 18 September 2014

The Portable Toilet Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for the cleaning and transportation of portable toilets.

The Portable Toilet Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This SWMS covers cleaning, pump-out of portable toilets and addition of cleaning/deodorising chemicals to the toilet tank. This also deals the general hazards associated with loading/unloading and transfer of portable toilets using a truck-mounted crane. Ensure site/task-specific SWMS are developed for hazards not covered in this SWMS.

Main hazards include:

  • Exposure to biological cotangents (raw sewerage and waste products)
  • Musculoskeletal Disorder (MSD) from hazardous manual tasks
  • Noise
  • Exposure to hazardous chemicals
  • Environmental impacts:
  • Contamination
  • Noise

This SWMS includes the following “High Risk Construction Work" as defined by Work Health and Safety Regulations 2011:

  • Possible live electricity
  • Mobile Plant
  • Working with flammables

The Portable Toilet Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.

The Portable Toilet SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee Sign Off Section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • Contact with Utilities
  • Hiab Crane or Truck Loading Crane
  • Traffic Management Plan

Operation: (extract only)

Toilet / Unit cleaning:

Conduct cleaning tasks as per site-specific SWMS. Operate equipment as per manufacturer’s instructions

Examples:

  • Wear PPE as required.
  • Open lid/cover using correct tools. Do not lean over tank or place face in towards the tank after lid/cover removal.
  • Place hose into tank. Remove contents as required. Continue process as needed.
  • Inspect entire hose regularly during cleaning process to ensure good seal. Check bonding integrity regularly throughout work.
  • When tank is empty, clean /deodorise as required. Use chemicals as per SDS and manufacturer’s instructions.

Note: Septene Odour Fresh is a hazardous substance (poison and irritant) and also a flammable liquid. Ensure no smoking and correct PPE worn (properly-fitted organic vapour respirator, half-face, chemical goggles, long sleeves/pants, enclosed footwear, impervious gloves etc). Wash hands after use.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...