Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Pre-Fabricated Homes - Transfer SWMS

Pre-Fabricated Homes - Transfer SWMS

Product SKU: 10276
Pre-Fabricated Homes - Transfer SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download Delivery

This SWMS includes:

  • PPE
  • Safety Notes
  • PlanningPreparation
  • Transporting
  • Maintenance
  • Emergency Procedures
  • References
  • Review Date: 14 March 2014
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

The Transport of Pre-Fabricated Houses & Buildings Information:

The Transport of Pre-Fabricated Houses & Buildings Safe Work Method Statement (SWMS) is a comprehensive 7 page procedure outlining the safety steps for the Transport of Pre-Fabricated Houses & Buildings. 

The Transport of Pre-Fabricated Houses & Buildings procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Transport of Pre-Fabricated Houses & Buildings Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

House Transportation Safety Notes: (extract only)

Do not begin transport if visibility is less than 250m (due to heavy rain, smoke, dust, etc.).

  • If visibility is reduced to less than 250m during transport, stop travel, park in a safe location and wait until it improves.
  • Obey road rules, speed limits, traffic signs and signals. For WA - Do not exceed 80km/hour (Check state laws)
  • Be aware of increased braking/stopping distance when carrying loads. Allow sufficient distance between other vehicles.
  • Pull over regularly (when safe) to allow passing traffic.
  • Maintain regular communication between transport vehicle and pilots.

 Pilot: 

  • Divided road – travel behind RAV
  • Non-divided – travel in front
  • Maintain distance from RAV to provide sufficient warning to others – consider speed, visibility, weather and geography of road.
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...