Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Vehicle - Hoist SWMS

Vehicle - Hoist SWMS

Product SKU: 10379
Vehicle - Hoist SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

The Vehicle Hoist Safe Work Method Statement is a comprehensive procedure outlining the safety steps for the use of a vehicle hoist.

The Vehicle Hoist SWMS is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This Safe Work Method Statement covers the use of Wheel Supporting Vehicle Hoists, Body Supporting Vehicle Hoists and Movable Hoists

This SWMS does not apply to car stackers, parking machine ramps or other vehicle lifting devices.

The latest instructions and recommendations for use should at all times be available to people working with the applicable vehicle hoist.                            

 Main Hazards include:

  • Crushing
  • Entanglement
  • Amputations
  • Lacerations
  • Falls from height
  • Muscular Skeletal Disorders

This SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation – All hoists
  • Operation – Wheel supporting vehicle hoists
  • Operation – Body-supporting vehicle hoists
  • Operation – Movable hoists
  • Maintenance
  • Emergency Procedures
  • Review
  • References

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

  Related items:

  •  Manual Handling – Hazardous Manual Tasks
  • LOTO – Lock Out Tag Out 

Operation – Wheel supporting vehicle hoists:
Ensure:

 -       Drive the vehicle slowly and carefully onto the hoist and position it centrally.

 -        If the vehicle has front wheel restraints, drive the vehicle forward until the wheels lock into the brackets.

 -       Check that it’s correctly positioned on the platform. If it is, apply the emergency brake and select first gear or park.

 -       Ensure vehicle mass is distributed equally

 -       Wheels are centred on runways (adjust runways to suit vehicle)

 -       Secure vehicles in position with stops or other securing devices

 -       If vehicle is running ensure it is in neutral (or park for automatic transmissions)

 -       Ensure vehicle at no time becomes unstable

 -       If using single ram hoist ensure hoist maintains position relative to floor recesses

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...