Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Wind Turbine - 10kW - Installation SWMS

Wind Turbine - 10kW - Installation SWMS

Product SKU: 10394
Wind Turbine - 10kW - Installation SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download Delivery
  • Provides a framework for training workers
  • Addresses generic risks and hazards
  • MS Word format allows you to make changes to the document
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

The Wind Turbine Installation Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps for the assembly, installation and erection of a 10kW Wind Turbine.

This SWMS does not cover operating and maintenance of 10kW Wind Turbines.

This SWMS does not cover operating mobile plant, and some technical aspects of designing and building cement footings in sufficient detail. Dedicated SWMS should be developed for these tasks, and for any risks not covered in this SWMS.

The following SWMS should be used in conjunction with the Wind Turbine Installation SWMS:

  • Working Around Mobile Pant
  • Working Around Electricity
  • Excavator
  • Forklift
  • Cement mixer
  • Concrete Preparation and Laying
  • Power Tools 

This SWMS involves the following “High Risk Construction Work” (Working on, in or near):

  • Powered mobile plant
  • Live electricity

Main hazards:

  • Struck by moving object – wind turbine parts, vehicles
  • Crushed by falling / moving object
  • Electric shock
  • Musculoskeletal Disorder (MSD) from hazardous manual tasks
  • Slips, trips & falls
  • Hearing loss      

Environmental risks may include excessive noise in close proximity to operational wind turbine, potential for injuries or death sustained by birds when blades are rotating.

This SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Start Inspection
  • Building the Foundations
  • Tower Installation
  • Earthing
  • Nacelle Installation
  • Tower Raising
  • Electrical System Installation
  • Emergency Procedures
  • Review
  • References

This SWMS is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

Product Details:

  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • Working Around Plant & Machinery
  • Working Around Electricity
  • Concrete Preparation and Laying

Product extract:

Fitting the Blades:

Before installing the blades ensure that the blade hub covers are installed on the turbine

Take care to fit the blades in the correct orientation -

It may be possible to fit the blades in the opposite direction and this could lead to dangerous situations occurring therefore installers should check carefully before bringing the bolts to full torque.

The blades may be bolted onto any position of the three blade hubs and it is essential to support

the blades weight whilst they are being installed.

After all three blades have been fitted and bolts torqued wait 30mins before re-checking torque

Always use the correct hand tools for the job when assembling the Nacelle.

Ensure workers use safe manual handling techniques and avoid:

-       Working for long periods without adequate breaks

-       Over reaching and over stretching

-       Sustained awkward positions

-       Manually lifting items that require mechanical lifting aids

 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...