Need a customised SWMS package? Contact us for a free quote or call 1300 306 604
The Pest Management - Bird Proofing Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls for bird proofing.
This SWMS covers the requirement to identify, assess and control hazardous manual tasks specific to the installation of materials to bird proof buildings. This SWMS covers general hazards and risks associated with works being conducted in the presence of overhead electric lines and in close proximity to railway tracks.
This SWMS includes:
Ready to Use
Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.
Product details:
Written by ex WHS inspectors Easy customisation with MS Word format (NOT PDF) Risk ratings before and after control measures Provides a framework for training workers Can be used as part of tender applications, WHS inductions, and Toolbox talks