Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Rail Maintenance – Re-timbering Turnouts SWMS

Rail Maintenance – Re-timbering Turnouts SWMS

Product SKU: 10313
Rail Maintenance – Re-timbering Turnouts SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

Rail - Retimber Turnout Information:

The Rail - Retimber turnout Safe Work Method Statement (SWMS) is a comprehensive 22 page procedure outlining the safety steps for the retimbering turnout sections on rail tracks.

The Rail Maintenance - Retimber turnout Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This SWMS involves general hazards/risks associated with re-timbering timber/concrete turnout sections on rail tracks when conducting rail maintenance.

Main hazards:

  • Vehicular collision
  • Hit by moving vehicle
  • Electric shock
  • Struck by moving/ejected object
  • Musculoskeletal Disorder (MSD) from hazardous manual tasks
  • Crushing injuries associated with loads

The Rail - Retimber Turnout includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Loading/Unloading sleeper transport vehicle
  • Operation
  • Maintenance
  • Emergency Plan
  • Review
  • References
  • Employee Sign off section 
  • Hierarchy of Controls
  • Risk Assessment Matrix

Operation: (extract only)

  • Replace /install spikes.
  • Use spike driver as per manufacturer's instructions. Example:
    • Wear appropriate PPE (safety boots, hearing protection, safety glasses, gloves)
    • Operator physically able to handle weight and forces of unit during operation
    • Ensure no loose clothing
    • Establish exclusion zone as required. Remove non-essential persons from area
    • Ensure tool clear of dirt, debris, grease
    • Position tool over required area
    • Ensure firm footing, feet shoulder width apart
    • Firm grip with both hands
    • Depress trigger to release spike
  • Clear area of ground workers, replace ballast using excavator with correct (paddle) attachment
  • Ensure timbers are bought up tight base of rail and tamped. Bring ballast up and ensure tamped to keep timber tight.
  • Ensure sufficient ballast bed - compacted, sufficient distance on each side of rail foot (example: 300mm)
  • For tamping tasks using excavator:
    • Clear persons. Establish exclusion zone
    • Ensure operator has full view of work site
    • Works to cease if persons approach exclusion zone
    • Ensure operator familiar with tamping head operations
  • Seek advice from relevant works authority for disposal of waste and reclamation procedures for any steel materials.
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...