Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604
20% OFF ALL SWMS & SOPS!!!! Ends 5pm 31st July 2017. Enter coupon SAVE20% at checkout.

SWMS Bonus Starter Pack

SWMS Bonus Starter Pack

Product SKU: 50136
SWMS Bonus Starter Pack Video

Other Details

PDF Download:
StarterPackBonus_Sample2015.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download Delivery
  • Provides a framework for training workers and identifying on-site hazards on a day to day basis
  • A SWMS provides written proof that safety training has taken place. 
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks
  • Includes a:
    • Manual Handling Safe Work Method Statement
    • Power Tools - General Operation Safe Work Method Statement
    • Job Safety Analysis Sheet 

Including two commonly required Safe Work Method Statement (SWMS) and a Job Safety Analysis Sheet this starter pack is an ideal starting point for businesses who are:

  • working towards reaching Workplace Health & Safety compliance and/or
  • meeting the requirements set out by Principal contractors. 

 

Safe Work Method Statement (SWMS)

  • The Manual Handling Safe Work Method Statement (SWMS) covers the requirement to identify, assess and control manual handling risks in the workplace. 
  • The Power Tools Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with the safe use of power tools. Where power tools can be classified as tools such as drills or chainsaws.  It does not cover the use of Power Actuated/Exploive Tools.

SWMS includes

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

 

Job Safety Analysis (JSA)

Undertaking a JSA enables those involved in the work task / activity to identify hazards that may be present and establish safety control measures (preventative measures) to precent harm to life, health, property or the environment. 

A JSA Worksheet assists in assessing the risks of doing a job. A Job Safety Analysis should be completed upon arrival on site with the purpose of identifying site-specific hazards prevent on the day.

Basic steps to follow when completing your JSA:

  • List the job steps that are involved in the activity
  • Identify any potential hazards in each job step and write these down next to each task
  • Determine the risk level for each hazard using the Risk Assessment Matrix
  • Document control measures by pinpointing solutions that either eliminate or minimise the risk of injury for each hazard identified
  • Monitor and re-assess

Don't forget

  • To include all employees involved in the activity when completing the JSA
  • Train all persons involved in the activity to ensure they are aware of the hazards
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

RRP:
$159.90
$139.90

PLUS GST

View Cart


You May Also Need...