Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

SWMS Starter Pack

SWMS Starter Pack

Product SKU: 50135
SWMS Starter Pack Video

Other Details

PDF Download:
SWMSStarterPack_Sample2015.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download Delivery
  • Provides a framework for training workers
  • A SWMS provides written proof that safety training has taken place. 
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks
  • Includes a:
    • Manual Handling Safe Work Method Statement
    • Power Tools - General Operation Safe Work Method Statement

Including two commonly required Safe Work Method Statement (SWMS) this starter pack is an ideal starting point for businesses who are:

  • working towards reaching Workplace Health & Safety compliance and/or
  • meeting the requirements set out by Principal contractors. 

 

Manual Handling SWMS

The Manual Handling Safe Work Method Statement (SWMS) covers the requirement to identify, assess and control manual handling risks in the workplace. 

SWMS includes

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • OperationMaintenance
  • Emergency Procedures
  • ReviewReferences
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

 

Power Tools - General Operation SWMS

The Power Tools Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with the safe use of power tools. Where power tools can be classified as tools such as drills or chainsaws.  It does not cover the use of Power Actuated/Exploive Tools.

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

RRP:
$159.90
$139.90

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...