Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Window Cleaning - BMU SWMS

Window Cleaning - BMU SWMS

Product SKU: 10287
Window Cleaning - BMU SWMS Video

Other Details

PDF Download:
Window_Cleaning_BMU_SWMS_SAMPLE_2015.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
 
  • Complies with current legislation in all States and Territories
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Covers the safe use of a permanent (Building Maintenance Unit) BMU for window cleaning on high-rise commercial buildings.

The Window Cleaning - BMU Safe Work Method Statement (SWMS) is a comprehensvice document that outlines the job steps, hazards, risks and control measures for Window Cleaning works for a permanent building maintenance unit. 

This SWMS does not cover temporary / portable BMU operation. Dedicated SWMS should be developed for any risks not covered in this SWMS.

The SWMS includes:

  • PPE
  • Job Steps: 
    • Planning
    • Preparation
    • Safety Precautions
    • Pre - start Inspection
    • Operation
    • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Worker Sign off
  • Risk Assessment Matrix 

Product Extract

All operators, involved with the use of the BMU must be trained and competent and hold a current High Risk Work Licence as required by State Regulators.

Ensure detailed installation specifications are developed (by competent persons) for the type of anchorage and location.

Consider:

- Type of anchor required

- Purpose of anchor (free fall, limited free fall, horizontal life-lines, restraint techniques etc.)

- Type of work being undertaken

- Safety factors

- Ultimate strength factors (= when the anchor/structure may yield but not fail).

Placement of anchor:

Adequate fall distance between operator and lower-level obstructions (machinery, open windows/doors and panels, tree limbs etc.)

- Position of workers

- Correct position to avoid pendulum effect etc.

Lanyards / lines can be attached from safe position (before entering fall risk area)

- Exposure to environmental factors

-  Type of likely fall and angle of incidence.

Rebound forces:

- Fastening devices (ensure all bolts, nuts, washers meet required maximum breaking strength for shear (lateral) and axial (tension) directions. Welds must be subject to non-destructive inspection and testing

- Structure for attachment

Exact location for attachment to structure

- Method of application/fastening.

 Note: Anchor points cannot be fastened to the following:

Conduit/ cable trays

Piping / support racks / Vent stacks

- Guards rails/ hand rails

Wood trusses (unless specifically designed), gable ends, fascia, overhangs, 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...