Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Plumbing SWMS Pack 10

Plumbing SWMS Pack 10

Product SKU: 50064
Plumbing SWMS Pack 10 Video

Other Details

PDF Download:
Plumbing_Call-out_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • This SWMS packs include 13 ready-to-use Safe Work Method Statements
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Plumbing Safe Work Method Statement Pack

This Safe Work Method Statement (SWMS) pack contains 13 SWMS in total. Each SWMS contained within the Plumbing Safe Work Method Statement pack includes an outline of the job steps, general hazards and controls associated with plumbing works including water jetting, stormwater drainage, gas fitting, hot works, sewerage - drainage and more.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

The 13 SWMS included in this pack are:

All SWMS in the Plumbing SWMS pack address:

  • High Risk Construction Work
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps
  • Potential Hazards
  • Control Measures
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

RRP:
$1,040.00
$715.00

PLUS GST

View Cart


You May Also Need...