Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Ceiling Panel & Insulation Installation (From EWP) SWMS 10642-1

Ceiling Panel & Insulation Installation (From EWP) SWMS 10642-1

Product SKU: 10642
Ceiling Panel & Insulation Installation (From EWP) SWMS 10642-1 Video

Other Details

PDF Download:
Ceiling Panel and Insulation Installation (from EWP) 10642-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Ceiling Panel & Insulation Installation (From EWP) SWMS | Safe Work Method Statement

This Ceiling Panel & Insulation Installation (From EWP) Safe Work Method Statement (SWMS) outlines the safety steps, general hazards and controls associated with the use of an Elevating Work Platform (EWP) to install ceiling panels and insulation.

Included in this SWMS is the planning and preparation, training, pre-start and operational controls associated with the task. This SWMS also includes a ‘Falls Emergency Rescue Plan’.

Job Steps Covered in Ceiling Panel & Insulation Installation (From EWP) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Implement & Falls Emergency Rescue Plan
  4. Delivery & Removal of EWP
  5. Assess On-site Conditions
  6. Working Near Utilities
  7. Work Area Set-up
  8. EWP Pre-start Check
  9. Placement of Panels & Insulation
  10. On Completion
  11. Refuelling on Site

Instant Document Delivery via Email 

FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)

For work carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of a SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each SWMS must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

jsa-iauditor.png

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...