Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Cladding Removal/Installation (From Swing Stage) SWMS 10491-1

Cladding Removal/Installation (From Swing Stage) SWMS 10491-1

Product SKU: 10491
Cladding Removal/Installation (From Swing Stage) SWMS 10491-1 Video

Other Details

PDF Download:
Cladding Removal _ Installation (from swing stage) SWMS 10491-1-SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Cladding Removal/Installation (From Swing Stage) SWMS | Safe Work Method Statement

This Cladding Removal/Installation (From Swing Stage) Safe Work Method Statement (SWMS) outlines the general hazards associated with the use of suspended scaffold systems to remove and install insulation, sarking & cladding.

Included in this SWMS is the planning and preparation, pre-start and operational controls associated with the task along with a ‘Swing Stage Pre-use Checklist’ and a ‘Falls Emergency Rescue Plan’.

Job Steps Covered in Cladding Removal/Installation (From Swing Stage) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Arrival & Site
  3. Implement a Falls Emergency Rescue Plan
  4. Work Area Set-up
  5. Pre-operational Inspection
  6. Working on Suspended Scaffold
  7. Removal/Replacement of Insulation/Sarking/Cladding materials
  8. On Completion 

Cladding Removal/Installation (From Swing Stage) Safe Work Method Statement Includes: 

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE Requirements
  • Emergency Response
  • Emergency Evacuation Procedure

Instant Document Delivery via Email 

FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)

For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - JSA and SWMS Integration

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...