Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Person in overalls wearing a face mask and gloves using a yellow spray bottle

Mould Remediation Clean Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Mould Remediation Clean Safe Work Method Statement

This Mould Remediation Clean Safe Work Method Statement (SWMS) covers hazards and controls associated with conducting mould remediation works after weather event or from another unexpected water source causing mould growth.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Mould Remediation Clean SWMS:

(includes potential hazards and control measures)

  1. Repair the Water Problem
  2. Planning
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Working with Powered & Non-powered Tools
  9. Working at Height on Ladders & Trestles
  10. Suppress Dust/Spores
  11. Remove all Wet & Mould-damaged Porous Materials
  12. Cleaning, Disinfecting & Deodorising
  13. Waste Disposal
  14. Decontamination
  15. On Completion
  16. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Mould Remediation Clean Safe Work Method Statement

This Mould Remediation Clean Safe Work Method Statement (SWMS) covers hazards and controls associated with conducting mould remediation works after weather event or from another unexpected water source causing mould growth.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Mould Remediation Clean SWMS:

(includes potential hazards and control measures)

  1. Repair the Water Problem
  2. Planning
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Working with Powered & Non-powered Tools
  9. Working at Height on Ladders & Trestles
  10. Suppress Dust/Spores
  11. Remove all Wet & Mould-damaged Porous Materials
  12. Cleaning, Disinfecting & Deodorising
  13. Waste Disposal
  14. Decontamination
  15. On Completion
  16. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View