Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Decks-Columns-Stairs Formwork set up.

Formwork Decks-Columns-Stairs Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Formwork Decks-Columns-Stairs Safe Work Method Statement 

This method statement for formwork covers hazards and controls for carrying out formwork for walls, columns and stairs. It includes information on how to erect frames including base plates & U heads, install bearers & joists, lay form ply sheets on decks & landings, stand form sections using a crane, apply bond breakers (if applicable), concrete pour and stripping the forms.

This Formwork Safe Work Method Statement will give you peace of mind knowing that your forms are installed correctly and safely. We know what works and what doesn't - so we've made sure our documents include all the relevant information but none of the unnecessary stuff that just wastes your time!

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Formwork Decks-Columns-Stairs SWMS: 

(includes potential hazards and control measures)

  1. Formwork Design
  2. Arrival On-site & Assess On-site Conditions
  3. Working Outdoors
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Materials Delivery
  9. Working with Powered & Non-powered Tools
  10. Working at Height on Ladders, Trestles, Mobile Scaffold & Openings
  11. False Decks
  12. Erecting Frames including Base Plates & U Heads
  13. Using Acrow Props
  14. Installing Bearers & Joists
  15. Laying Formply Sheets on Decks & Landings
  16. Standing Form Sections using a Crane
  17. Applying Bond Breakers (if applicable)
  18. Concrete Pour
  19. Stripping Formwork (planning)
  20. Stripping Formwork
  21. On Completion
  22. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Formwork Decks-Columns-Stairs Safe Work Method Statement 

This method statement for formwork covers hazards and controls for carrying out formwork for walls, columns and stairs. It includes information on how to erect frames including base plates & U heads, install bearers & joists, lay form ply sheets on decks & landings, stand form sections using a crane, apply bond breakers (if applicable), concrete pour and stripping the forms.

This Formwork Safe Work Method Statement will give you peace of mind knowing that your forms are installed correctly and safely. We know what works and what doesn't - so we've made sure our documents include all the relevant information but none of the unnecessary stuff that just wastes your time!

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Formwork Decks-Columns-Stairs SWMS: 

(includes potential hazards and control measures)

  1. Formwork Design
  2. Arrival On-site & Assess On-site Conditions
  3. Working Outdoors
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Materials Delivery
  9. Working with Powered & Non-powered Tools
  10. Working at Height on Ladders, Trestles, Mobile Scaffold & Openings
  11. False Decks
  12. Erecting Frames including Base Plates & U Heads
  13. Using Acrow Props
  14. Installing Bearers & Joists
  15. Laying Formply Sheets on Decks & Landings
  16. Standing Form Sections using a Crane
  17. Applying Bond Breakers (if applicable)
  18. Concrete Pour
  19. Stripping Formwork (planning)
  20. Stripping Formwork
  21. On Completion
  22. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View