Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604
This Concrete Kerb & Channel Installation Safe Work Method Statement (SWMS) outlines the general hazards associated with the installation of extruded concrete kerb and channel.
This SWMS includes planning and preparation, training and use of a kerb and channel machine including refuelling.
(includes potential hazards and control measures)
Instant Document Delivery via Email
FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)
For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.
Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.
Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.
We're here to help if you need us!
Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au
SWMS Frequently Asked Questions | Helpful Video Tutorials