Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Cool Room Construction SWMS 10599-2

Cool Room Construction SWMS 10599-2

Product SKU: 10599
Cool Room Construction SWMS 10599-2 Video

Other Details

PDF Download:
cool_room_construction_swms_10599-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with current legislation in all Australian States/Territories & New Zealand.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Cool Room Construction SWMS | Safe Work Method Statement

This Cool Room Construction Safe Work Method Statement (SWMS) outlines the general safety steps, hazards and controls relating to construction of cool/freezer rooms using insulated panelling.

Included in this SWMS is planning and preparation, manual handling considerations, working on platform ladders and trestles, working near EWP, cutting and joining insulated panel products and use of mastic sealants.

Job Steps Covered in Cool Room Construction SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Assess On-site Conditions
  4. Materials Delivery & Placement
  5. Work Area Set-up
  6. Cutting/Trimming/Joining Panels & Angle Lengths
  7. Using Caulking Products/Gun
  8. Positioning & Levelling Base Panels 
  9. Standing Wall Panels & Installing Roof Panels
  10. Working at Elevated Positions 
  11. On Completion

Cool Room Construction Safe Work Method Statement Includes:

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE Requirements
  • Emergency Response
  • Emergency Evacuation Procedure

Instant Document Delivery via Email 

FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)

For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - JSA and SWMS Integration

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...